Feb 16, 2018 Update

The construction site will be closed down this weekend, including Monday, for Presidents’ Day.

The installation of our deep foundation will continue to be a 24-hour a day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. This work will be most noticeable at various times over the next 6 weeks when the drilled foundations are installed on the 1st Street site. Neighbors should notice a reduction in noise starting around mid-March.

In late February, we will begin installing overhead pedestrian and vehicular protection on Ecker between Jessie and Mission Street next to the work site. This will require the full closure of Ecker to vehicular traffic for two weekends during the day. Ecker will continue to remain open to pedestrians at all times. Once the timeline is confirmed, notification regarding timing will be posted.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *